Multiphase
Installations

Production Enhancement Onshore France: Boost LP wells into first stage separator.
MPP4  
 Actual Flow:  50,000 bpd (350 m3/h)
 Actual GVF:  66 to 100%
 Inlet pressure:  36 to 230 psia (2.5 to 16 bar abs)
 Outlet pressure:  up to 650 psia (45 bar abs)
 Power:  800 HP (600 kW)

Multiphase Transport Onshore Siberia:
Boost flow to production centre.

  

 MPP7  
 Actual Flow:  83,000 bpd (550 m3/h)
 Actual GVF:  40 to 88%
 Inlet pressure:  75 to 150 psia (5 to 10 bar abs)
 Outlet pressure:  up to 260 psia (18 bar abs)
 Power:  530 HP (400 kW)

Production Enhancement Onshore Sumatra:
Reduce well backpressure.

 MPP7  
 Actual Flow:  150,000 bpd (1,000 m3/h)
 Actual GVF:  40 to 95%
 Inlet pressure:  35 to 190 psia (2.5 to 13 bar abs)
 Outlet pressure:  up to 260 psia (18 bar abs)
 Power:  700 HP (550 kW)

Production Enhancement Offshore North Sea:
Boost flow to production centre.

  

 MPP8  
 Actual Flow:  180,000 bpd (1,200 m3/h)
 Actual GVF:  30 to 90%
 Inlet pressure:  725 to 1,830 psia (50 to 126 bar abs)
 Outlet pressure:  up to 1,830 psia (126 bar abs)
 Power:  6,000 HP (4,500 kW)

To learn more about this installation visit http://www.total.com/en/press/press_releases/pr_1999/991103__1723.htm

 

back
Source: http://www.sulzerpumps.com/DesktopDefault.aspx/tabid-185/246_read-288/usetemplate-PrintPage/
Copyright Sulzer Pumps Ltd, 2008